Skip to main content

Model Checker

Will QPs be notified when MC MVP completes the checks?

How can I track the history of all Pre-submission checks for my project?

What should I do if I have feedback on the Model Checker results?

What is the process for getting technical support if I encounter issues with Model Checker?

If the BIM model has been checked by MC MVP, will the agencies still perform manual checks?

Is it necessary for QPs to review the design after the BIM models are checked by MC MVP?

Is the MC MVP the final version of MC? Will more clauses and requirements be checked by MC in the upcoming version?

What is MC?

What are the benefits of MC?

Can QPs use the MC to check their BIM models before submitting via CORENET X?

How can I prepare for MC MVP (Beta)? What are the modelling requirements for MC MVP (Beta)?