Agency-Specific Queries
- [URA] Will agencies' consolidated reply include URA's GFA verification?
- [URA] Will URA's feasibility study and outline application be required to submit through CORENET X?
- [URA] What is the submission process for projects that involves review by the Design Advisory Panel?
- [URA] Can CORENET X capture envelope control outlines on irregular sites?
- [BCA] Will BCA Green Mark, Buildability Score, Constructability Score, and ETTV / RTTV calculations be required in CORENET X?
- [BCA] Will M&E Electrical / Lift / Lightning Protection submissions be required in CORENET X?
- [BCA] Are temporary works such as ERSS for basement excavation required to be incorporated into the coordinated BIM model for CORENET X submissions?
- [SCDF] Can Fire Safety Engineers (FSEs) who currently do not have a CORENET account make performace-based fire safety engineering submissions via CORENET X?
- [SCDF] Will unprotected opening calculations for SCDF submissions be included in CORENET X?
- [SCDF] How will performance-based Fire Safety Engineering (FSE) solutions be accepted in CORENET X?
- [SCDF] Can the M&E Engineer indicate deviations from the approved Construction Gateway model such as new locations or coverage of fire protection elements during Technical Clearance?
- [PUB] Will submissions by licensed plumbers be required in CORENET X?