Submissions
- I am interested in submitting a project via CORENET X ahead of the mandatory submission dates. Are there any preparatory works required?
- Under CORENET X, who should be the first person to create the project or initiate joint submission?
- Why do I have to do a joint submission? This is different from today’s process.
- When will a submission be considered successfully made?
- Which agency or department has the final say to issue an approval at each Gateway?
- How will CORENET X accept submissions for large developments?
- Will CORENET X allow QPs to have multi-agency pre-submission consultations?
- For A&A projects, is the existing development required to be modelled for submission?
- Will D&B projects be required to submit via CORENET X?
- How will waivers be issued in CORENET X?
- Will agencies continue to issue Written Directions (WDs) independently in CORENET X?
- Will the consolidated Written Directions (WDs) be directed to specific consultants? Will consultants from all disciplines be able to access all the consolidated comments?
- Are QPs required to provide a consolidated response back to the agencies' Written Directions (WDs)?
- What is the timeframe during which QPs are required to reply to agencies after receiving the consolidated Written Directions / comments?
- Will there be a change in the QP's statutory responsibilities under CORENET X?
- Must all QPs of all the three disciplines (Architectural, Structural, M&E) submit multi-disciplinary coordinated BIM model for all submissions in CORENET X?