How will CORENET X accept submissions for large developments?
While projects should be submitted as a whole in general, we recognise that there may be a need to split larger projects into phases. Prior to submission, the project team will be required to carry...
-
What is the payment limit for PayNow QR?
The payment limit is S$200,000 per transaction.
-
Must CORENET X submissions be geo-referenced?
Yes, all submissions must be geo-referenced to SVY 21 and sit properly on the cadastral base. Proper geo-referencing is essential to ensure that project data, including GIS data, are accurately inc...
-
Is drainage (new and removed) required to be modelled in the IFC+SG model?
Drains should be in 3D unless there is a suitable representation that makes it easier for the industry to model without compromising on the processing by officers. For example, PUB will check drain...
-
What will happen to the approvals that were obtained under CORENET 2.0? Do I have to restart the whole approval process in CORENET X all the way from Design Gateway and remodel everything in IFC+SG format?
Agencies’ approvals that have already been issued under CORENET 2.0 will remain valid. Works that have commenced on site based on approvals obtained under CORENET 2.0 can continue and the relevant ...
-
Can Fire Safety Engineers (FSEs) who currently do not have a CORENET account make performace-based fire safety engineering submissions via CORENET X?
Yes. The login for CORENET X is via Singpass, similar to today’s login for CORENET 2.0.
-
Are details in the current schematic diagrams such as for drainage and sanitary works required to be modelled in the IFC+SG model?
Sanitary drain lines are to be submitted as schematic and/or 2D drawings. It is optional to submit in 3D. If industry submits these details in 3D, it will also be accepted. Please refer to Section ...
-
Will D&B projects be required to submit via CORENET X?
Yes, D&B projects are required to be submitted via CORENET X and are subject to the same regulatory approval process. While the approvals are not issued until all the agencies cleared the submissio...
-
Will unprotected opening calculations for SCDF submissions be included in CORENET X?
Yes, these calculations should be submitted together with the Building Plan at Construction Gateway.
-
I received a notification from my consultant with a payment link. How do I ensure that the payment link is legitimate?
Please check that the payment link starts with “https://pay.corenet.gov.sg”.