Must CORENET X submissions be geo-referenced?
Yes, all submissions must be geo-referenced to SVY 21 and sit properly on the cadastral base. Proper geo-referencing is essential to ensure that project data, including GIS data, are accurately inc...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Can I use my firm's IFC+SG template?
The IFC+SG Resource Toolkit provides templates and configuration files as a base for industry to use. Firms can incorporate and adapt their company information into the templates.
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
How will 2D elements (e.g. general notes, standard details, typical details) be modelled in the IFC+SG model?
2D details are to be submitted separately from the IFC model as supplementary documents. Please refer to the CORENET X Code of Practice on the BIM and non-BIM supplementary documents that are requi...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Must all QPs of all the three disciplines (Architectural, Structural, M&E) submit multi-disciplinary coordinated BIM model for all submissions in CORENET X?
QPs are required to make submissions for the requirements at the respective Gateways that are related to their statutory responsibilities. While it is possible that there are Gateway(s) that a QP d...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Will there be a change in the QP's statutory responsibilities under CORENET X?
No, the submission via CORENET X would be a joint submission by the relevant QPs. Thus, the statutory responsibilities of each QP remain unchanged, including all standard endorsements under the res...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Is there a ready set of object library / families that industry can adopt for submission via CORENET X?
Object libraries are currently being explored. There is also feedback that it may stifle creativity or conflict with existing in-house libraries, all these will be taken into consideration, and we ...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
What is the extent of modelling required for external works submissions?
External works can be submitted in 2D.
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
What is the timeframe during which QPs are required to reply to agencies after receiving the consolidated Written Directions / comments?
The project team will be given up to 60 days to respond, after which the Written Directions will expire. If required, the project team may request for an extension to respond to the WDs.
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Are QPs required to provide a consolidated response back to the agencies' Written Directions (WDs)?
Yes, consultants will need to provide a consolidated response to address agencies' written directions / comments that require responses from multiple QPs in the same ‘project team’. This consolidat...
-
Vasuki Somasundarabharathi (ICTD, BCA) created an article,
Are details in the current schematic diagrams such as for drainage and sanitary works required to be modelled in the IFC+SG model?
Sanitary drain lines are to be submitted as schematic and/or 2D drawings. It is optional to submit in 3D. If industry submits these details in 3D, it will also be accepted. Please refer to Section ...