General
- What is CORENET X and its current scope?
- How do I participate in this current release?
- What is the implementation timeline for CORENET X?
- Will there be other submission functions in CORENET X besides submission for regulatory compliance?
- What functions will be covered under CORENET X?
- Will CORENET X eventually accept land subdivision plans?
Training and Events
- Is there training for CORENET X?
- Where can I find the materials of past CORENET X events and webinars?
- Can I explore the functions of CORENET X submission portal?
- What is the purpose of the CORENET X training environment?
- Are there training courses on how to use the CORENET X Submission Portal?
- Why do I need to register for an account to use the CORENET X training environment?
Process
- Do all projects go through the same process?
- What are the requirements at each Gateway and how is each Gateway cleared?
- Will TOP applications be consolidated in a single submission at the Completion Gateway?
- How will independent submissions be submitted?
- Are amendments allowed after submission at each Gateway?
- What is Direct Submission Process (DSP)?
Submissions
- I am interested in submitting a project via CORENET X ahead of the mandatory submission dates. Are there any preparatory works required?
- Under CORENET X, who should be the first person to create the project or initiate joint submission?
- Why do I have to do a joint submission? This is different from today’s process.
- When will a submission be considered successfully made?
- Which agency or department has the final say to issue an approval at each Gateway?
- How will CORENET X accept submissions for large developments?
Login
BIM & IFC+SG Modelling Requirements
- Will QPs need to model in the earlier approved models and deleted elements in the amendment submissions?
- What is the BIM software that is accepted by CORENET X?
- What is the IFC format supported in CORENET X submissions?
- What is the available Model View Definition (MVD) for IFC+SG?
- Can multiple IFC models (e.g. from different disciplines) be submitted within each CORENET X submission?
- How do I export multiple linked files (together with the host file) from the BIM software into an IFC file?
Approved Plans
- Will the approved plans be IFC models or 2D drawings in CORENET X?
- Will all members (e.g. licensed builders, REs, RTOs) have access to the approved models that were submitted to agencies under CORENET X?
- Will the approved plans in CORENET X be archived so that information will be available to another QP when the development undergoes A&A in the future?
- Will CORENET X store our past project documents? If not, how long will the information remain available for access?
Payments
- The computation of fees for my submission under CORENET X appears incorrect. What should I do?
- What are the modes of payments available for projects submitted through CORENET X?
- What types of payments are supported under CORENET X?
- What are the payment related features available under CORENET X?
- Who can make payment?
- Why can’t I make payments for certain agencies?
Mode(s) of Payment
Using PayNow QR
- What is PayNow QR?
- What is the payment limit for PayNow QR?
- What if my fees exceed S$200,000?
- What if I accidentally made more than one payment using the same PayNow QR?
- What should I do if the online PayNow QR expires?
- Will I receive a notification after I complete payment using PayNow QR?
Payment Process and Confirmation
- I received a notification from my consultant with a payment link. How do I ensure that the payment link is legitimate?
- How do I know if my payment is successful? Will a receipt be mailed to me?
- How long will it take for payment to be reflected in the system?
- How can I check the status of my payments?
- Who should I approach if I need help or clarification on the payment to be made or payment made?
- After successful payment, I did not receive any email confirmation or receipt. What should I do?
Refund
Automated Model Checker (AMC)
- What are the rules or regulatory codes that will be checked by the Automated Model Checker?
- If the coordinated BIM model has been checked by the Automated Model Checker, will the agencies still perform manual checks?
- Will the QPs be able to view the non-compliances identified by the Automated Model Checker?
- Can QPs use the Automated Model Checker to check their model before submitting it via CORENET X?
- I have obtained waivers for my project. Will the Automated Model Checker reject my submission due to the deviations?
- Will the Automated Model Checker affect modelling methods?
Other Queries
- Extension of timelines for Additional Buyer's Stamp Duty (ABSD) remission and Project Completion Period (PCP) to facilitate transition
- The new regulatory process focuses on upstream design coordination to minimise downstream works. However, this is going to lead to longer period before sales may launch and works may commence. What can be done to minimise delays to projects?
- What are the file extension supported in CORENET X submission?
- Who can I contact if I still require further help?
Agency-Specific Queries
- [URA] Will agencies' consolidated reply include URA's GFA verification?
- [URA] Will URA's feasibility study and outline application be required to submit through CORENET X?
- [URA] What is the submission process for projects that involves review by the Design Advisory Panel?
- [URA] Can CORENET X capture envelope control outlines on irregular sites?
- [BCA] Will BCA Green Mark, Buildability Score, Constructability Score, and ETTV / RTTV calculations be required in CORENET X?
- [BCA] Will M&E Electrical / Lift / Lightning Protection submissions be required in CORENET X?